The Digest of upcoming webinars has been updated as of June 23.
Notable additions include:
Cell Analysis (1)
Spectroscopy (1)
Check Out:
Elemental Analysis in Yeast Cells and Microplastics by ICP-MS with Automated Micro-Flow Sample Introduction…
A 5% H2 blend should work also. If you're using multiple calibration standards, make sure the range of the standards matches or exceeds the expected range in your samples.
One thing to watch for: I have seen instances where H2 saturates the TCD at high…
Offsetting the axes, Y or X, is not a feature in MassHunter. You can do head to tail comparison.
Overlaying in different colors and choosing which one is active can be done but there's not a way to do what you're asking even in a custom report.…
Good morning. We analyze fatty acids and The compound response factor of each fatty acid before the softwere changed remained fixed now it changes. I tried to copy the various parameters set in the other gas chromatograph which has its own softwere, but…
Hello,
I'm having the same problem with the overwhelming amount of orange highlighting for samples where the qualifier peak was not found. I tried the suggestion above of enabling "Ignore Peaks Not Found" in the method and re-applying it to the batch…
The tune evaluation was written for an orthogonal ion source (SS/Inert/Extractor) system, atune or etune, running helium carrier gas between 0.8 and 1.4 ml/min, at 230° C ion source and 150° C quad temperatures. It may not pass using other temperatures…
Hello,
I am not sure which Agilent software (CDS 2.x , Chemstation, EZChrom) you are using, but most customers use third party software for simulated distillation and other RT vs BP petrochemical calculations. If your need is simpler, you could do…
This Information Applies To: 4150 TapeStation, 4200 TapeStation
Issue
How to deal with a TapeStation Electrode Cartridge change is due warning message.
Background
The Agilent TapeStation controller software will notify users to replace the...
This Information Applies To: Agilent OpenLab CDS
Issue
Sometimes the integration result is not ideal for all injections. This article outlines the step-by-step instruction to manually integrate peaks.
Background
There are 2 ways to integrate...
This Information Applies To: Agilent OpenLab CDS , Agilent OpenLab ChemStation
Issue
Calculation of Area percent or Height percent for uncalibrated compounds in OpenLab software. If all components respond equally in the detector, then Area% and...
This Information Applies To: Agilent ICP-MS (7700/7800/7850/7900/8800/8900)
Issue
How to power off the Agilent ICP-MS Foreline Pump to perform maintenance, or when fully powering off the Agilent ICP-MS System.
Background
The ICP-MS MassHunter...
This Information Applies To: Agilent ICP-MS (7500,7700,8800)
Issue
How to check the E2M18 or E2M18F foreline pump to determine if the pump needs maintenance?
Background
The oil cleanliness and oil level in the E2M18 or E2M18F foreline pump...
This Information Applies To: Agilent ICP-MS (7700/7800/8800)
Issue
How to replace the foreline pump oil in the DS 402.
Background
The DS 402 oil should be replaced at least every 3 months or when the oil color indicates it needs to be changed...
This Information Applies To: Agilent 8890/8860 GC Systems
Issue
How to delete data that is stored on the GC instrument.
Steps to follow
Caution : Before deleting data from your GC, Agilent recommends extraction of data as a backup...
This Information Applies To: 5200, 5300 and 5400 Fragment Analyzer, Femto Pulse and ZAG DNA analyzer
Issue
When no data is available in the Agilent ProSize data analysis software for one or more capillaries, the capillary(ies) could be misaligned...
This Information Applies To: Agilent ICP-MS (7800/7850/7900/8900)
Issue
How to check the MS40+ or MS40-S foreline pump to determine if the pump needs maintenance?
Background
The oil's cleanliness and level, in the MS40+ or MS40-S foreline...
This Information Applies To: Agilent ICP-MS systems (7700/7800/7850/7900/8800/8900)
Issue
Powering on Agilent ICP-MS Systems after maintenance, long-term shutdown, or for power cycling.
Steps to Follow
Confirm that the ICP-MS power plug...