Hi Sean...I think I've touched that particular instrument a long time ago. Gary - 50% 28 and 13% 32 after 24 hours is quite a big leak, maybe not massive but certainly needs fixing.
If the system worked fine before it was cooled off for a power fail…
Hi Ive got a Varian 979 leak tester, however after a few runs the fine leak test does not work. If I use "Read standard Leak" then after it fails to switch on fine leak test. Can you please point me in the correct direction. Thanks John
Hello,
From the error code this look like error 5 with red light 2 and 4 on. Axis movement failed. Either something is blocking the X movement or there is a problem with the sensor. This will require repair. Please call the response center to get…
The Digest of upcoming webinars has been updated as of December 27.
Check Out:
New Year resolution for my ICP-OES: I will keep my ICP-OES analysis free from contaminants on January 17
Potency with LC/UV on February 1
Optimizing the GC to Get…
Hello,
Our lab currently uses a headspace-GC-FID to analyze for ethanol in blood samples. We have a multi-level, internal standard calibration curve as well as control samples at various concentrations that are analyzed in a sequence. Is there a way…
Ok, I've tried to condition the column three times and no improvement. I also have clipped some of the inlet end of the column and reinstalled and that did not help either. I have not checked inlet as I have not worked on them before and I don't have…
Hello, i'm a Milan university student in thesis in an analytical lab.
I'm currently trying to develop an analytical method to isolate and analyze Niaprazine in G C-FID , by using as internal standard Phenacetin . But as i know we, in this laboratory…
I changed my acquisition method from using front FID to back FID. I changed this in the acquisition method detector, signals, and columns sections. On my status tab, the detector is still showing front FID and the online signals is showing no options…
Hello, I have a G1321B that showed errors during the OQPV. The FSE changed the flash lamp Iand the Intensity test is OK arround 10000 counts buen the and Raman ASTM Signal/Noise fail. I want to know if there are another test to do.
Hello, This issue sounds like the one described in KPR#:245690 of the OpenLab ChemStation Software Status Bulletin: https://www.agilent.com/cs/library/support/Patches/SSBs/M83xxAA.html#TTID:245690 I have copied the contents of the relevant entry below…
This Information Applies To: Agilent MassHunter 11 and later
Issue
Generating Acquisition Desktop and Quantitative Analysis shortcuts.
Steps to Follow
Double-click the Control Panel icon on the desktop or select Windows Start menu > Agilent...
This Information Applies To: Agilent MassHunter Workstation for LC/TQ and MassHunter Workstation for LC/TOF and LC/Q-TOF
Issue
How to view the MassHunter Data Acquisition Software Logs entries, change settings, and export the Logbook for archiving...
This Information Applies To: ICP-MS MassHunter with User Access Control (UAC)
Issue
It is necessary to update the database folder path in Change User Access Control:
After creating a new database in SDA with ICP-MS MassHunter.
To view a batch...
This Information Applies To: Agilent GTA 120, 240/280 GTA Furnace
Issue
Over time, the electrodes may become pitted or eroded and users may see a decrease in precision or begin to experience the "Tube fault" error when new tubes are installed. If...
This Information Applies To: Agilent GTA Furnace and Flame Instruments, Agilent 240FS/240GFAA/GTA120/PSD120
Issue
There may be occasions when users need to remove GTA furnace center block workhead (instruments with both Flame and Furnace capabilities...
This Information Applies To: Agilent GTA 120, 240/280 GTA Furnace
Issue
The shroud should be replaced annually, or when there is evidence of damage caused by mechanical shock or contamination from liquid spillage.
Items Required
Shroud Removal...
This Information Applies To: Agilent GTA 120, 240/280 GTA Furnace
Issue
Before replacing the electrodes and/or shroud, the GTA Furnace workhead will need to be disassembled. After replacing the electrodes and shroud, the GTA Furnace workhead will...
This Information Applies To: Agilent 5200/5300/5400 Fragment Analyzer, Femto Pulse, ZAG DNA Analyzer
Issue
After starting a run, the run is aborted with the following error: Current = 0.0uA, Expected range: 5 - 3000.
Steps to Follow
Check...
This Information Applies To: Agilent OpenLab CDS 2.x in file system configuration
Issue
Sometimes, you will need to change the Projects Root Path / Project Storage Path . This article outlines the procedure on how to change it.
Background
...
This Information Applies To: 5000 series ICP-OES (5100,5110,5800,5900), AVS 4/6/7
Issue
Steps to bypass the AVS to troubleshoot poor performance on the ICP-OES
Tip : These steps should be completed after the Subsystem Communication...