Box and Space Requirements
Boxes/Space Requirements:
- The boxes are in the way, may I open them?
- Do not open any boxes! All boxes should remain unopened as received from Agilent.
- How big are the crates that will arrive?
- Will there be space to store them before the installer arrives?
- The crates are HUGE! GC, Computer and peripherals, MS, pumps, etc.
- Is there access to the lab from the receiving location? Cart? Lift? Pallet jack? Elevator? Doors open? Badging? Signing in/out?
- It is easiest if the crates are brought as close to the lab bench as possible before the installer arrives.
- Has the lab met Health, Safety, and Security requirements?
- Are there any restrictions to site access for the installer?
- Is there open, clear, empty bench space, around, behind, and above where the instrument will be installed? Will it support the maximum system weight plus a safety margin?
GC minimums - W: 84”, H: 40” w/ALS, D: 26”.
GC/HS minimums - W: 116”, H: 40”, D: 26”.
GC/MS SQ minimums - W: 92”, H: 40”, D: 26”
GC/MS TQ minimums- W: 96”, H: 40”, D: 40”
- Trash – Is there room for it?
- There are a lot of boxes and bags!
- Who will take it away?
- You are responsible for all trash.