no you don't need to disconnect it from the FID, ,
bake the column for enough time usually more than 1 hour according to your column status , you can keep the FID working to monitor the baseline .
..
keep temperature 25 degrees less than the maximum…
Using the Agilent 7890A. Column installed with no leaks detected. Both the front and back detector are set to 300°C, gas Flow Rates - Hydrogen: 45mL/min, Air 450mL/min and He 1.0mL/min. The split flow is 80mL/min. Following initial start up the front…
Thanks for the tips on seeing the position in the sequence once Aquisition has been restarted. Unfortunately something I failed to mention is that the sequence also disappears after pressing run but will re-appear once you toggle between another module…
Hi all, I am using a GC 6890 with split/splitless inlet to analyse reaction products. However, a problem has recently happened when the GC is running. I have noticed the appearance of spikes in the baseline of the FID detector. The spikes appear occasionally…
Get a WS asynchronous error : F F60304 The torch ignition has failed when starting a Varian 720 OES The torch lights and stays on for about 5 seconds then shuts down with this error. I can not find reference in the help to resolve this. Thanks, Scott
Hi John, You are on the right track-- it sounds like your flame is not lit. The reading you are seeing on the Hydrogen line is likely back-pressure from the column flow. That result could indicate a blockage in the jet, but the flow is a little low to…
Hello, im having a problem with a 2d GC using the Deans Switch system. Its a 8890 GC with 2 FIDs. The problem is that, when cutting peaks from the 1st dimension to the 2nd dimension (2nd column), all peaks on the 2nd dimensions get split into 2 peaks…
It looks like it is having to clear something out the inlet, column, detector or head space as the baseline rise is over most of it. I see it's a FID you are using, how long do you leave it ignited before running the first analysis?
Hi, I have a agilent GC 7890B with FID. currently i am a facing a problem regarding this GC, problem is like that - all gases supply is ok, no leakage is found in detector portion. i have cleaned the FID & Jet but flame is not burning. So kindly suggest…
Hi all,
I'm using a 0.18 mm HP-5 GC Column on a Shimadzu GC-2014 connected with a FID. I'm looking to get new ferrules (the old ones had been passed down from previous users) and wanted to discuss some options. I tried using some 0.5 mm graphite ferrules…
This Information Applies To: Agilent MassHunter 11 and later
Issue
Generating Acquisition Desktop and Quantitative Analysis shortcuts.
Steps to Follow
Double-click the Control Panel icon on the desktop or select Windows Start menu > Agilent...
This Information Applies To: Agilent MassHunter Workstation for LC/TQ and MassHunter Workstation for LC/TOF and LC/Q-TOF
Issue
How to view the MassHunter Data Acquisition Software Logs entries, change settings, and export the Logbook for archiving...
This Information Applies To: ICP-MS MassHunter with User Access Control (UAC)
Issue
It is necessary to update the database folder path in Change User Access Control:
After creating a new database in SDA with ICP-MS MassHunter.
To view a batch...
This Information Applies To: Agilent GTA 120, 240/280 GTA Furnace
Issue
Over time, the electrodes may become pitted or eroded and users may see a decrease in precision or begin to experience the "Tube fault" error when new tubes are installed. If...
This Information Applies To: Agilent GTA Furnace and Flame Instruments, Agilent 240FS/240GFAA/GTA120/PSD120
Issue
There may be occasions when users need to remove GTA furnace center block workhead (instruments with both Flame and Furnace capabilities...
This Information Applies To: Agilent GTA 120, 240/280 GTA Furnace
Issue
The shroud should be replaced annually, or when there is evidence of damage caused by mechanical shock or contamination from liquid spillage.
Items Required
Shroud Removal...
This Information Applies To: Agilent GTA 120, 240/280 GTA Furnace
Issue
Before replacing the electrodes and/or shroud, the GTA Furnace workhead will need to be disassembled. After replacing the electrodes and shroud, the GTA Furnace workhead will...
This Information Applies To: Agilent 5200/5300/5400 Fragment Analyzer, Femto Pulse, ZAG DNA Analyzer
Issue
After starting a run, the run is aborted with the following error: Current = 0.0uA, Expected range: 5 - 3000.
Steps to Follow
Check...
This Information Applies To: Agilent OpenLab CDS 2.x in file system configuration
Issue
Sometimes, you will need to change the Projects Root Path / Project Storage Path . This article outlines the procedure on how to change it.
Background
...
This Information Applies To: 5000 series ICP-OES (5100,5110,5800,5900), AVS 4/6/7
Issue
Steps to bypass the AVS to troubleshoot poor performance on the ICP-OES