FID baseline integration settings

I’m running GRO/DRO/ORO on an 8890 FID. The baseline is cutting across the peaks instead of integrating under the baseline. How do I drop the red integration line so that I get proper area under the given ranges? 

Parents Reply Children
No Data
Was this helpful?