Putting the GC/MS rough pump under the bench - SQ and TQ

This shows where to drill a 2.5" (6.35 cm) hole in the bench to be able to pass the rough pump hose fittings through to be put the rough pump on a shelf below the bench.  Information on how to vent the rough pump to a lab exhaust system is also included.

Was this helpful?