  • Hello,

    No that is not possible in CC or IR if the calibration standards are not present in the result set. What you could do is setup the method to update the method RT at 100% when running the standards. This way the expected RT is the same as the found calibration standard RTs for each compound. At that point you could just subtract the ERT from the RT to get the delta. 