Instrument controller disaster test

Hi!

We need to test to turn off the intrument controller (AIC) during a running a sequence.
In Ezchrom A.04.06, Build: 1.255.227 software it worked well, if we unplugged the cable and then re-plug it every sequence finished with complete results.
Now we upgraded to CDS 2.6 and this feature is not working because the sequence incomplete, only the last item in the run queue row finished and the results aren't complete after the connection loss.
Is it a software or a configuration issue?
Thanks for your help in advence.

Bence

Was this helpful?