AnsweredAssumed Answered

Integrating peaks with Chemstation

Question asked by emartinez on Jan 7, 2019
Latest reply on Jan 9, 2019 by ryoboyle

I would like to be able to set a threshold for peak integration for peaks outside my established calibration that doesn't affect the peaks in the calibration.  Is this possible in Chemstation? 

For example, if I have three peaks I am calibrated for at a peak height of 100 and I want to integrate all unknown peaks present at peak height of 150, is there a way to set the integration to grab only those unknown peaks at 150, but still integrate all three compounds observed in my calibration table regardless of their peak height? 

Thanks

Outcomes