New to Openlabs-- we currently use Openlabs 2.6. In data processing we want to be able to "cut off" or reject retention times after 22 minutes? Is there a way to do that as part of the processing method?
thanks for any assistance!
Find maintenance, best practice, and troubleshooting articles.
New to Openlabs-- we currently use Openlabs 2.6. In data processing we want to be able to "cut off" or reject retention times after 22 minutes? Is there a way to do that as part of the processing method?
thanks for any assistance!
Hello,
In your method you can used timed events to turn integration on and off for sections of the chromatogram. If you chose signal specific events this can be done per signal channel if needed.
Marty
Hello,
In your method you can used timed events to turn integration on and off for sections of the chromatogram. If you chose signal specific events this can be done per signal channel if needed.
Marty
I do not appear to have that option though it is likely I just do not know how to add it
sorry, I was able to find more options by right-clicking and adding integration events-- thank you so much for pointing me in the right direction.