Hello all,
I'm trying to figure out a way to include BPC plot and resulting peak retention times and areas in to a report. Is there a way to do this? version is C.01.10(239)
Thanks,
Milinda
Hello all,
I'm trying to figure out a way to include BPC plot and resulting peak retention times and areas in to a report. Is there a way to do this? version is C.01.10(239)
Thanks,
Milinda