Readiness Tab in MassHunter Edit Method screen missing

I currently have 3 GCs (a 6890 and two 7890s) hooked up to a single computer all using MassHunter.  The 6890 aquisition station is missing the readiness tab under Method edit and runs the method before the oven and inlet are at their specified starting temperatures.  The 7890s have the readiness tab and work just fine.  Is there a toggle that I missed when setting up the 6890 to show this option, or does anyone know why the Readiness Tab isn't showing up for this instrument.

Thank you for any information.

Was this helpful?